My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9A - Minutes 111810
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2010
>
12-16-2010 Planning Commission Meeting
>
9A - Minutes 111810
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 3:42:44 PM
Creation date
5/13/2016 3:42:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Lind suggested building retaining walls rather than the north pond to catch the water. <br /> �. The existing retaining walls are stopping the stormwater. The runoff issue is below the <br /> driveway. He would like to add retaining walls and curb it even more. <br /> Mr. Marohn stated that in general,the retaining walls are providing an area to collect <br /> stormwater. <br /> When asked, Mr. Lind stated the retaining wall behind the house will be removed when <br /> the basement is built. That area will become lawn. <br /> The Design for the ISTS has been submitted. <br /> Public Comment: None. <br /> Mr. Marohn explained that the Variance is for a basement where the crawl space is and <br /> making the basement 2 feet higher. 4 � <br /> Vice-Chair Adams stated he would like to add a c6ii tion_,,,, nce the project is <br /> finished there would be an inspection that would con the height increase is 2 feet and <br /> the impervious coverage does meet the less than 25%requirement. <br /> When Mr. Lind asked about his timeframe, Mr. Marohn explauied that he would need to <br /> act within 12 months (apply for a permit in 12 months)and then he would have 24 <br /> months to finish the exterior. <br /> A motion was mad eb Bill seconded by John Derksen,to approve the Variance <br /> request, based on fhe lowing Findings of Fact: <br /> 1. b" ;. ya4`-3 ,1z:`'• <br /> 1. The subject properfyi locate ' 067 Pequot Boulevard and is zoned Shoreline <br /> Residential. <br /> 2. The subject property is on Sxbey Lake which is a General Development Lake. <br /> 3. The proposed SSTS woulde approximately 7 feet from the road right-of-way, <br /> while normally 10 feet is required. <br /> 4. The existing dwelling is 52.3 feet from the OHW, while 75 feet is required. The <br /> footprint of the existing structure will remain the same. <br /> 5. The proposed SSTS would encroach approximately 4 feet into the sideyard <br /> setback of the southern property line. <br /> 6. The maximum amount of impervious coverage allowed is 20%. Currently the <br /> property contains 32.8% impervious coverage. With the proposed removal of <br /> impervious surfaces,the final coverage of the parcel would be 24.7%. <br /> 7. The existing height of the building is 19 ft, with the additional two courses and <br /> increase in roof pitch,the height of the dwelling will be 21 ft. <br /> 8. The property owner has the right to replace the structure with a structure of the <br /> exact dimensions, footprint, roof pitch, etc. <br /> 9. The improvement of the structure requires a variance since the property owner <br /> �.. wishes to increase the overall height of the structure. <br /> Minutes 3 <br /> Pequot Lakes Planning Commission <br /> November 18, 2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.