My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07 - Fire Department Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2012
>
08-07-2012 Council Meeting
>
07 - Fire Department Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2014 5:52:12 PM
Creation date
12/19/2013 3:35:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
During the years that Maple Township contracted with us there rate wen# from $3500.00 <br />� per year to approximately $14,000 this year. A big factor for this increase was that their <br />building valuation increased from 3.5 million dollars to 14 million from 2002 to 2012. <br />Our fair share fire contract policy shares the cost of operation of the fire deparhnent as <br />equally as we can using a comparison of building valuation and the actual hours the <br />department serves each area during the year. This calculation process is averaged over a <br />ten yeaz time period so contract ra.tes are stable. <br />The fire department's engine committee has been planning what type of pump truck is <br />best for our department and how we can finance the purchase. The present engines the <br />department has are a 1978, a 1995 and a 2003. Realistically we have an aging fleet. In <br />order to meet ISO standards our department needs another engine to satisfy requizements <br />for water flow. Our contracted areas have a higher percenta.ge of commercial buildings <br />than our neighboring fire departments have. A new engi.ne should lower our ISO ra.te <br />which would lower insurance rates. <br />The committee has a finance rate offer of 3.5 % from the USDA during 2012. The <br />payments for a new engine aur committee has planned for would be about the same as we <br />were making for our Peterbuilt engine. This would assure our fire contract rates will be <br />about the same as they have been for the next several years. <br />Donovan motioned the Fire Board approve the plan to purchase the new engine �vith the <br />same payments as we have had in the past years. Barteis second the motion. The motion <br />� passed unanimously. <br />Chief Nelson informed the Board the deparlment will be burning some ostrich barns in <br />Breezy Point this Saturday. <br />Chief Nelson also informed the Board that hazardous materials inspection fees have <br />increased from $450.00 to $550.00 for buildings the department burns. <br />On a somewhat related thought Benson informed the Board of the sta.te's decision to <br />demolish the nursery at Badoura and pay huge fees to have asbestos removed from their <br />buildings before they are leveled. <br />Our next scheduled meeting is October 31St, which is Halloween. With everyone's <br />approval the meeting date was changed to October 24�'. <br />Sjoblad motioned to adjourn, second by Bensan, meeting adjourned. <br />NE7�T MEETING Uctober 24, 2012 at 7 pm (mark your calendar) <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.