Laserfiche WebLink
reduced or some guidelines set up. A revolving loan fund could be included. Micro <br /> lending was discussed;Region Five is working on a micro lending plan. <br /> Pequot Lakes Economic Development{organization should be changed to Brainerd Lakes <br /> Area Development Corporation(BLADC). The services BLADC provides should be <br /> expanded. <br /> The third Policy was discussed: Ensure a skilled and educated local workforce. The City <br /> could encourage this,rather than ensure. A competitive school district is important in <br /> attracting a skilled and educated workforce. The school system should be strong or <br /> excellent,not just good. Threat of an aging population is underling education. The <br /> City needs population diversity. This may fit in the Hous ng� ct* The City could <br /> impact education by exploring shared services with the school dtnet,encourage safe <br /> routes to school,ensure public recreational facilities and�jibs for y �. <br /> '2 <br /> The forth Policy was discussed: Provide appro at,, <br /> e housing options ft�r" e local <br /> �� . <br /> . <br /> workforce. The City could encourage the Hoy and Redevelopment Autr"' y to <br /> RE <br /> build starter homes. <br /> ff ra <br /> The Policies need to address where a commercial opment is going to be <br /> allowed, such as Business Park exp a 3 d areas for p al manufacturers. <br /> �, p <br /> C * <br /> th <br /> PUBLIC HEARING: , ..;. <br /> 2` fir, <br /> APPLICANT: Jo hi 1rlurphy` <br /> Applicant requests ariance to Construct duff Setback and Lake Setback. <br /> Sh <br /> Mr. Marohn explained the staff epprt Appl}ci t was present as well as Bob Ogdahl <br /> � i t <br /> from Arclu e <br /> l� <br /> 4UIt $ t <br /> No p � comment ; <br /> Chairman stated tha mm had been received from Planning Commission <br /> Member Pe and as "that his comments be made part of the record. <br /> , <br /> Zuni <br /> Due to the size of i iiiiscussion included reconfiguring the structure to snake it <br /> conforming and ' °�e addition out of the setbacks. The shed is being removed and is <br /> approximately 100 scl. ft. The sun room could be moved back so it isn't encroaching as <br /> much,possibly 3 feet. <br /> Egress windows would be added within the bluff setback. The plan does not agree with <br /> the elevations. The bluff is being cut down. Mr. Marohn stated that the window wells <br /> would not be a grading issue;a visual walkout would be an issue. <br /> Minutes 2 <br /> Pequot Lakes Planning Commission <br /> February 18, 2010 <br />