Laserfiche WebLink
G. Design and siting of the tower with particular reference to design <br /> characteristics and location that have the effect of reducing or eliminating <br /> visual obtrusiveness; <br /> H. Proposed ingress and egress; <br /> I. Availability of suitable existing towers and other structures as discussed in <br /> Article 43.8 G; and <br /> J. Impact to the existing aesthetics and character of the surrounding area. <br /> I. Level of adherence to the provisions set forth in 43.1 of this article. <br /> 43.10 EXISTING TOWER FACILITIES <br /> Existing tower facilities may continue in use and perform routine maintenance for the <br /> purpose now used and may not alter,convert,modify,transform,vary,add to or change <br /> in any way the approved use or form of the tower. Existing tower facilities shall be <br /> considered for the co-location of other antenna(s). The owner of an existing tower facility <br /> shall file an annual notification in writing to the Planning and Zoning Office as to the <br /> continuing operation of every tower facility constructed.Failure to do so shall be <br /> determined to mean that the tower facility is no longer in use and considered abandoned. <br /> 43.11 ROUTINE MAINTENANCE <br /> All tower facilities shall be maintained in a safe and clean manner.The tower facility <br /> owner shall be responsible for maintaining a graffiti,debris and litter free site.The <br /> landscape plan shall be maintained for the life of the tower facility. Trimming the tops of <br /> trees on site shall be allowed,only to maintain the average height of the canopy used to <br /> establish tower facility height.All tower facilities shall be subject to periodic inspection <br /> to ensure continuing compliance with all conditions of the application submitted and <br /> approval requirements. <br /> 43.12 TIME LIMIT ON TOWER FACILITY CONSTRUCTION <br /> Construction of an approved tower facility must be completed within two years following <br /> the date of the approval.Landscaping must be installed within the first growing season <br /> immediately following construction. <br /> 43.13 UNUSED OR ABAAIDONED TOWER FACELITY <br /> The of a tower-f :lky shall file an annual nefif eetie in «:fing to the Dle <br /> 43.13 ABANDONMENT AND REMOVAL <br /> Tower facilities that are not in use for one hundred eighty(180)consecutive days shall be <br /> considered abandoned and shall be removed by the owner within one hundred eighty <br /> (180)days.Removal includes the complete tower facility including related <br /> infrastructures,footings and other underground improvements to a depth of thirty-six <br /> (36)inches below existing grade,and restoration to pre-existing vegetative cover.Failure <br /> to do so shall be just cause for Crow Wing County to seek legal avenues that will remove <br /> the tower facility and restore the site. <br /> 43.14 LIGHTING STANDARDS FOR TOWER FACILITIES <br />