Laserfiche WebLink
�. <br /> that fequir-es nefifleatien te Crew Wing Geunty Planning and Zening Offiee pfief te <br /> eaneellafien will be fumished. <br /> Cede and., statement that f ii,,..ing a ..leae ,.feens,....oie the towe, <br /> by the State ef Mftmesota, <br /> Tower design and their antennas shall be certified by a licensed professional en ig neer <br /> to ensure that they conform to applicable state structural building standards. <br /> M. The applicant shall submit proof, in the form of a signed affidavit,demonstrating a <br /> good faith effort to lease or purchase space on an adjacent existing tower facility.The <br /> affidavit shall state why space is not available such as: <br /> L The planned tower facility would exceed the structural capacity of the <br /> tower facility and the structural capacity cannot reasonably be increased; <br /> ii. The planned tower facility would cause interference with the usability of other <br /> existing or planned equipment at the tower facility; and/or <br /> iii. Existing tower facility cannot accommodate the planned antenna at a height <br /> necessary to function reasonably. <br /> N. The owner of the tower facility shall provide Crow Wing County with an acceptable <br /> financial guarantee in an amount equal to one-and-one-half(1-1/2)times the cost to <br /> remove the tower facility and restore the site.This amount shall be determined by the <br /> Crow Wing County Planning and Zenin Commission based on input from an <br /> independent technical expert and be is based on the likelihood that the tower facility <br /> may be abandoned. <br /> O. All wetlands within 50'of the proposed infrastructure related to tower construction <br /> and access shall be delineated. A letter or report shall be submitted to Crow Wing <br /> Coup!y by the wetland professional performing the work which describes the <br /> presence or absence of wetlands. <br /> 43.9 Factors Considered in Grantin!a Conditional Use Permit <br /> The Crow Wing County Planning Commission shall consider the following <br /> factors in determining whether to issue a Conditional Use Permit <br /> A. Height of the proposed tower facility; <br /> B. Capacity of the tower structure for additional antenna equipment to <br /> accommodate expansion or to allow for co-location of another provider's <br /> equipment; <br /> C. Proximity of the tower to residential structures and residential zoning_ district <br /> boundaries; <br /> D. Nature of uses on adjacent and nearby_properties; <br /> E. Surrounding topographer <br /> �, F. Surrounding tree coverage and foliage; <br />