Laserfiche WebLink
C. A visual study depicting where within a one(1)mile radius any portion of the <br /> proposed tower facility will be visible. <br /> D. Site plan(s)drawn to a scale of one(1)inch equals twenty(20)feet or less, <br /> specifying the location of tower facility, support structures,transmission buildings <br /> and/or other accessory uses, access,parking, fences, signs, lighting,landseaped-a ees <br /> and all adjacent land uses within two hundred forty(240)feet of the base. <br /> E. A landseape plan designed te ser-een the base ef the tewer-fheility and feneing, shall <br /> be submitted. The plan shall shew the leemien, size, quanfity,and t)Te ef se <br /> materials and shall be dfav�%te a seale ef one(1) ineh equals twenty(20)feet eF less, <br /> general sts-Id-Wer-d-S ee-k-b-is Miele. The landseape plan(s)shall also indieate th i , <br /> te)-AFpr-ese vmien. <br /> F. Elevation drawings of"before" and"after" simulating and specifying ground levels, <br /> the location and height of antenna(s), support structures, equipment buildings and/or <br /> other accessory uses, fences and signs of the tower facility. <br /> G. Map showing the search radius for the antenna location and the proposed broadcast <br /> coverage obtained by the tower facility, including a narrative describing a search <br /> radius of not less than one(1)mile for the requested site,clearly explaining why the <br /> site was selected, identifying and locating landing and takeoff areas of aircraft within <br /> the search radius, locating all existing tower facilities, and identifying all other <br /> structures that may be potential co-location sites. In addition,for those towers <br /> proposed to exceed 199 feet in height,the applicant must demonstrate that the <br /> selected site will meet gaps in service that cannot be addressed by existing sites and <br /> that the service gaps exist due to unique topo¢raphic,land ownership or other <br /> environmental issues that can only be resolved by construction of a higher tower. In <br /> addition,the applicant shall demonstrate whether there will be a reduction of the <br /> number of towers required to gap service if a higher tower is approved. <br /> H. A letter that requires the tower facility owner and successors to allow the shared use <br /> e€co-location of antenna on the tower facility if an additional user(s)agrees in <br /> writing to meet reasonable industry terms and conditions for shared use. <br /> I. A copy of the FAA determination or a signed statement that the proposed tower <br /> facility has not been found to be a hazard to air navigation under Part 77,Federal <br /> Aviation Regulations,or that no compliance with Part 77 is required, and the reasons <br /> therefore. <br /> I A copy of the FCC's license or a signed statement from the proposed operator of the <br /> tower facility attesting to the fact that the tower facility complies with current FCC <br /> regulations, including compliance with the regulations of the FCC with regard to <br /> maximum radio frequency and electromagnetic frequency emissions, or a statement <br /> from the applicant that no such compliance is necessary, and the reasons therefore. <br />