Laserfiche WebLink
B. Slope stabilization. Dirt moving in a bluff impact zone is prohibited. Dirt moving on steep <br /> slopes may be allowed with a an"permit from the <br /> Planning and Zening Land Services Department. Dirt moving on or in steep slopes <br /> must not create unstable soil conditions. <br /> C. Degree of finished slope. Plans to place fill or excavated materials on steep slopes must be <br /> reviewed by SWGB the Land Services Department for continued stability and must not create <br /> finished slopes of thirty(30)percent or greater or be located in the SIZ or Bluff Impact Zone. <br /> D. Negative impact. The fill or excavation shall not negatively impact public waters,roads, <br /> adjacent or affected properties. <br /> E. Erosion control and stabilization. Best Management Practices Metheds to minimize soil <br /> erosion and to trap sediments before they reach any surface water feature shall be utilized. <br /> Er-esien een#e!fnetheds shall be reviewed by the SNWD. Aftered areas shall be stabilized to <br /> F. Dirt moving permits are cumulative . All Dirt <br /> movin,,,/filliaWexeavating Permits shall <br /> en4y be cumulative according to Article 28.4 not to exceed permitted amounts for the life of <br /> the property exeluding a tetal of feuf hundred(4 00) square feet ef eumulative ef fill in <br /> .eflan.7 aivas within the CIZ.,n&e«DT 7 <br /> G. Access across wetlands. Lake access across wetlands in the SIZ shall be by an elevated <br /> walkway no more than-feer-(4)six 6 feet in width_ <br /> R Stermwatermanagem <br /> 28.6 MINE PIT LAKES <br /> Due to the fragile nature of slopes along those lakes created due to the cessation of mineral <br /> mining activities the following shall apply: <br /> A. Setback. There shall be no dirt moving/filling or excavating within one hundred twenty-five <br /> (125)feet of an eroding bluff or steep slope.Where slumping is evident,the setback shall be <br /> measured from the top edge of the eroding bluff or crest of a steep slope. <br /> B. Erosion control. Slope and bluff erosion control measures and time frame for <br /> implementation shall be submitted and approved by C[T�the Land Services Department. <br /> C. Access. Access down steep slopes or bluffs shall be by above ground stairways. <br /> D. Blasting prohibited. Blasting for foundation/footings is prohibited in mine pit areas. <br /> E. Other provisions. All other Shoreland Alteration provisions of this Ordinance shall apply. <br />