Laserfiche WebLink
A motion was made by Mark Hallan, seconded by Bill Habein,to place on record that it <br /> is the interpretation of the Planning Commission to be in favor of replacing the roof <br /> system with gable span trusses with 4/12 roof pitch; not to increase the height of the <br /> building,total height of 8 feet,match back wall; maintain existing structure;use truss <br /> system to replace and upgrade lakeside wall for that support system. All members voted <br /> "aye". Motion carried. <br /> Next month the Planning Commission will look at the requirements of Section 4.4(3). <br /> OLD BUSINESS: None. <br /> APPROVAL OF MINUTES: sf <br /> A motion was made by Deb Brown, seconded by . k Hallan,to appro the August, <br /> 2011 Minutes as read. All members voted Motiow ararried. <br /> ZONING ADMINISTRATOR'S REPORT: <br /> Bittner pointed out the 10 permits issu&tl,#nd the 6 letters ails sent and received. <br /> The following Potential Violations/Enforcemont Actions we oussed: <br /> 1. Thomas Tulenchik—Bittner explained th6'eity, has reps ed the Compliance <br /> Inspection and this matter is resolved. <br /> 2. Dale Olson—S , . ed to fo=MN/DOT on stabs`of restoration. <br /> 3. RV Park si taff ted to regarding sign. <br /> Market Forces—The b 011,3111 scussed at the October meeting. <br /> ADJOURNMENT:fi <br /> A motlon,was made by Mark Hall Al econded by John Derksen,to adjourn the meeting. <br /> All member's voted"aye". Motior carried. The meeting was adjourned at 9:11 p.m. <br /> Respectfully submitted, <br /> Dawn Bittner <br /> Zoning Administrator <br /> Minutes 4 <br /> Pequot Lakes Planning Commission <br /> September 15, 2011 <br />