My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2012
>
06-05-2012 Council Meeting
>
09 - Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2014 4:21:04 PM
Creation date
12/17/2013 3:48:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />Wastewater Dept. <br />I. Facilitv Performance: <br />a. CBOD Concentration <br />Influent —310 mg/1 (No Design Listed) <br />Effluent — mg/1 <br />b. TSS Concentration <br />Influent — 315 mg/1 (No Design Listed) <br />Effluent — mg/1 <br />c. Effluent Fecal Coliform — N/A <br />Permit Condition — 200 organisms/100 ml <br />d. Flow - Average Daily Flow — 56,000 gallons (Design —121,795 gal/day) <br />Maximum Daily Flow — 67,000 gallons <br />Minimum Daily Flow — 44,000 gallons <br />Total Monthly Flow— 1,684,000 gallons <br />II. Operations and Maintenance: <br />• The monthly MPCA Discharge Monitoring Report (DMR) was completed and <br />`.- submitted. <br />• Trailsides lift station. Has a bad level sensor, we are going to raise the floats and let the <br />back up floats run this lift station. If that area ever grows and gets enough flow we can <br />then replace the transmitter. No need to spend the money now. Transmitters are a <br />$1000.00, plus labor to install. <br />• Transferred water from pondl to pond 2 in preparation for Irrigation. <br />• Jetted the sewer line from Olsen Street to Pro-Build Lift Station. <br />• Jetted Sewer line from East Sibley north to end of line. Customer compliant of slow <br />toilet. <br />• Water plant alarm, nothing wrong <br />• Pump 1 at Industrial Park Lift Station has high Amp draw. ( Rags in Pump) <br />• Another alarm at water plant tested Battery in UPS- OK. Replaced Battery in Auto <br />Dialer. <br />Report Submitted By: Lee Bundy (Water/Wastewater Manager) <br />Please call me if you have any questions/comments. <br />218-568-5604 or 218-330-3940 <br />\.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.