My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2012
>
06-05-2012 Council Meeting
>
09 - Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2014 4:21:04 PM
Creation date
12/17/2013 3:48:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />Water/Wastewater Report <br />Apri12012 <br />Water Dept. <br />I. Facilitv Performance: <br />Average daily gallons pumped: 85,000 gallons <br />Maximum daily gallons pumped: 101,000 gallons <br />Minimum daily gallons pumped: 61,000 gallons <br />Total monthly gallons pumped: 2, 405,000 gallons <br />Average daily chlorine concentration: 0.53 mg/1 <br />Required chlorine concentration: 0.2 to 0.5 mg/1 <br />*Average daily fluoride concentration: .98 mg/1 <br />*Required fluoride concentration: 0.9 mg/1 to 1.5 mg/1* <br />�� <br />*The MDH is currently reviewing the pros and cons of fluoride addition and <br />is looking at lowering the required amount to a range of 0.6 mg/1 to 1.0 mg/1* <br />II. Onerations and Maintenance: <br />• The MN Department of Health Monthly Fluoridation Report was completed and <br />submitted. <br />• Completed weekly testing. <br />• Completed monthly Water plant maintenance <br />• Raised Tower Height to summer level. <br />• Read the water meters <br />• Completed all Water service requests. <br />• Completed all Locate Requests <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.