Laserfiche WebLink
Create a berm at the top of the hill to prevent storniwater from running down <br /> the slope and directly into the wetland. <br /> Stabilize the loose material at the top of hill with permanent ground cover <br /> (grass, shrubs,aggregate material,etc..)to prevent erosion. <br /> Re-vegetate the top of the hill to provide screening of the structures as viewed <br /> from the highway. You indicated that you would be planting some high bush <br /> cranberry trees to provide this screening. <br /> d 9f <br /> i <br /> Thank you for all of your cooperation throughout this process. We look forward to <br /> receiving the initialized copy of this memo back fiorn you. I can be reached at 218-330 <br /> 6694 if you have any questions. <br /> Sincerely, <br /> CITY OF PEQUOT LAKES <br /> Charles Marehn <br /> Planning and Zoning Administrator j <br /> Cc: Planning Commission <br /> Dawn Bittner,Zoning Clerk <br /> Roger Langenbau <br />