My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.01 - CSAH 11 Corridor Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2012
>
06-05-2012 Council Meeting
>
05.01 - CSAH 11 Corridor Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2014 4:13:02 PM
Creation date
12/17/2013 3:48:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�.. <br />� <br />� <br />CSAH 11 CORRIOR STUDY REPORT <br />CORRIDOR VISION <br />The County has requested the study partners adopt a resolution of support for this study. This study will <br />serve as a guide as development as investments are being made along the corridor. The County will <br />remain a partner as the communities develop to preserve the safety and mobility of CSAH 11. <br />This Corridor Study is the vehicle to understand issues and concerns from a technical, regulatory, and <br />community standpoint. The project included development of alternatives that effectively addressed the <br />issues and concerns, essentially becoming the "roadmap" to advance continued planning, design, and <br />funding of improvements that address existing and future needs on the corridor. This effort has been <br />culminated in the preparation of this study report that the County, Cities, Townships, School District, and <br />general public can get behind and support to make traffc flow along the corridor safe and efficient. <br />Prepared by: Bolton & Menk, Inc. <br />CSAH 11 Corridor Study <br />Executive Summary <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.