My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.03 - Roadway Turnbacks
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2013
>
09-03-2013 Council Meeting
>
09.03 - Roadway Turnbacks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 9:36:33 AM
Creation date
12/17/2013 2:54:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ci ty of <br />Pequot <br />Lakes _ _ <br />AGENDA ITEM #9.3 <br />REPORT TO <br />CITY COUNCIL <br />Report Prepared by: Tim Houle — City Engineer <br />Date: September 3, 2013 <br />Subiect: Discussion on Roadway Turnbacks <br />Report: The Highway 371 Committee met on Wednesday <br />morning, August 14. In attendance were Sandy Peine, <br />Dawn Bittner, Mike Loven, Jim Oraskovich, Justin Burslie <br />(Community Growth), and Tim Houle (WSN). Wes Wilson <br />was not present as he is the alternate for Jim Oraskovich. <br />Just as reminders: a) This was only the 2nd meeting of this <br />committee, b) This was the first meeting with P&Z <br />representation, and c) This Hwy 371 project process has <br />extended over several years, people have come and gone, <br />and "details" have changed over time. <br />At present, the City is responsible for about 35 miles of <br />roadway. With the present Hwy 371 and other roadways, <br />the City could gain about 6 miles of roads through turn <br />backs (from MnDOT to the County to the City, and from <br />
The URL can be used to link to this page
Your browser does not support the video tag.