My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8B - Downtown Plan Update
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2014
>
11-20-2014 Planning Commission Meeting
>
8B - Downtown Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 9:21:08 AM
Creation date
4/25/2016 9:20:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. The area located at the northeast corner of the State Highway 371 and County State Aide <br /> Highway 11 is a potential location for another sign to identify Trail-side Park. It is also a potential <br /> location for the existing community sign due to better visibility. <br /> r4" <br /> 9. The area directly north of the band shell should continue to be a free and open space. Concert- <br /> goers should be allowed to freely wonder between the concert area and other areas of the park. <br /> vs <br /> Ar t, <br /> T" { <br /> =�, Nan-Aet7neJ seating area � 1� / , ` <br /> 10. The crossing of Main Street (CSAH 11) by the Paul Bunyan Trail should be enhanced. It is the <br /> busiest pedestrian crossing in the City and it should be designed to protect pedestrians to the <br /> fullest extent possible. The crossing currently has a painted crosswalk and a temporary sign <br /> which notifies motorists to look for pedestrians. Once County Road 11 is turned back to the <br /> Pequot Lakes Downtown Plan— Updated November 2014 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.