My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10 - P & Z Admin Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2014
>
05-15-2014 Planning Commission Meeting
>
10 - P & Z Admin Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2016 8:57:23 AM
Creation date
4/25/2016 8:57:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR ADAMS MOVED TO DEVELOP A COMMITTEE TO CHOOSE <br /> THE STREET LIGHT DESIGN FOR NORTH WASHINGTON. COUNCIL <br /> MEMBER GARDNER SECONDED THE MOTION. MOTION CARRIED 4-0. <br /> Council Member Gardner suggested that the committee also work on the <br /> other aesthetics of the project. <br /> Mayor Adams noted that Council Member Pederson has requested a <br /> drawing of the retaining wall. <br /> Nelson Road - The Township is still interested, but the project has been "on <br /> the shelf' /on hold as requested by the City. <br /> Hwy 371 - Conversations continue with the County Engineer and MnDOT on <br /> portions of their anticipated responses to the City's initial negotiation <br /> spreadsheet. Once the County and MnDOT provide responses, it is <br /> anticipated that there will be some committee meetings, possibly with <br /> County and MnDOT representatives, to see where we agree, where we are <br /> close, and where we might be far apart. All will be brought back to the <br /> Council, especially the latter situation, so the Council can make final <br /> commitments. <br /> MnDOT and the County were provided with two options to move the <br /> proposed CR 112 realignment further away from Mr. Rasmussen's house. <br /> They are still only options, and a meeting is anticipated with MnDOT, the <br /> City, and the County on next steps. <br /> WWTF Facility Plan - The draft of the Facility Plan is not ready to present to <br /> the Council as we are awaiting some cost information from an irrigation <br /> supplier on the new set of pivot irrigators option. There has also have been <br /> some challenges by the preliminary design of the rapid infiltration basin <br /> option; the existing soils may accept the wastewater too quickly, so <br /> management of the nitrogen will have to be addressed. <br /> Mike Loven questioned the work being done on County Road 112 relating to <br /> the Rasmussen property. He noted that the City is paying for this work and <br /> the Council has not yet made a final decision as to whether it wanted to <br /> have the road turned back to the City. It was the general consensus of the <br /> Council that the Council would be in favor of accepting County Road 112 as <br /> a turn back from the County. <br /> 10.2. TIF Request—Trailside Estates <br /> Brad Person, attorney, and Eric Johnson, developer approached the <br /> Council. Mr. Person stated that the developer is looking at ways to <br /> economically develop the Trailside Estates property. He explained that it <br /> May 15, 2014 Staff Report Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.