My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3 - Downtown Plan Update
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2014
>
08-21-2014 Planning Commission Meeting
>
3 - Downtown Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2016 1:22:37 PM
Creation date
4/22/2016 1:22:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT- 816114 <br /> ere are various initiatives that the City can undertake to improve the value of Trailside Park. Those include the <br /> ` 'Mlowing: <br /> 1. Remove the underutilized parking lot located at the north end of the park. The area should be converted into a <br /> "usable area"by planting grass and other vegetation. <br /> 2. At the north end of the park, trees have been planted between the trail and the diagonal parking area on <br /> Government Drive. These trees should be allowed to mature so there is a perceived barrier between the trail <br /> and the street. Some sightlines should remain open between the park and Government Drive businesses so <br /> trail users can clearly see what Pequot Lakes has to offer. <br /> 3. Work with the Park Commission to determine a suitable location for a playground. Two areas that have been <br /> identified as possible locations are northeast of the picnic shelter and west of the picnic shelter. <br /> Possible locations for a playground: <br /> IV <br /> 5 <br /> 1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.