Laserfiche WebLink
aquatic vegetation (principally reeds and bulrushes) will need to be removed in the <br /> vicinity of"System Three." <br /> Conditions to Consider: <br /> i. Proper permits shall be obtained from the Minnesota Department of Natural <br /> Resources before any aquatic vegetation is removed. <br /> Beach Areas: <br /> The applicant has indicated the existing beach area for the resort is 140 feet wide. The <br /> applicant is proposing to increase the width of the existing beach (located on the <br /> southwest side of the property)by 35 feet. <br /> A second beach area is proposed on the east side of the point. The proposed beach area <br /> is approximately 150 feet wide and is located immediately south of"Dock System #2." <br /> The applicant has indicated that some aquatic vegetation will need to be removed for the <br /> creation/expansion of the beach areas. <br /> Staff is awaiting feedback from the DNR regarding the proposed beach areas. <br /> Conditions to Consider: <br /> i. A plan acceptable to the Planning Commission shall be submitted detailing the <br /> location,width,length and depth of the proposed beaches. <br /> 2. The applicant shall demonstrate with professional grading and drainage plan how <br /> untreated runoff will be prevented from entering the lake via the proposed beach <br /> `. areas. Grading in the vicinity of the beach areas should include the use of berms, <br /> swales and natural vegetation near the beach areas. <br /> 3. A permit shall be obtained, if necessary, from the DNR for the removal of any <br /> aquatic vegetation. <br /> Relocation of Boat Rama <br /> The applicant is proposing to relocate the existing boat ramp to the north side of the <br /> existing beach and swimming area. The proposed location is safer as truck/boat traffic <br /> would not impede on the swimming/beach area. Relocation of the ramp will require <br /> removal of approximately io feet of aquatic vegetation on the north side of the beach to <br /> allow for installation of the boat launch. <br /> Staff is awaiting feedback from the DNR regarding the relocation of the boat ramp. <br /> Roadway in Shore Impact Zone: <br /> Condition number 12 of the existing CUP states, "The road in the bluff and shoreline <br /> setback shall be removed and re-vegetated. An 8-foot wide walking trail may replace the <br /> road; however, all automobile traffic shall be banned. The walking trail shall be <br /> constructed with pervious materials." <br /> The Applicant is requesting the following regarding the pathway: <br /> Pequot Lakes Staff Report 4(a)_3 <br /> January 16,2014 <br />