Laserfiche WebLink
Infrastructure Improvements <br /> The infrastructure in nearly the entire project area is due for some type of rehabilitation project. <br /> This creates an excellent opportunity to modify what is in place to enhance the downtown <br /> environment. <br /> One of the key infrastructure improvements that need to be made is to provide storm sewer <br /> throughout the downtown. The style and intensity of the development needed in this area <br /> demands that there be a mechanism for managing stormwater. While some localized systems, <br /> such as a rain garden, can be utilized,the scope of the issue will require curb and gutter,pipe <br /> and an outlet. The curb and gutter will also assist with the aesthetics and function of the <br /> downtown, neatly defining the border between the pedestrian and auto spaces. <br /> It is also going to be critical to the overall aesthetic that the utility lines are buried throughout <br /> the downtown and that utility boxes are in alleys or otherwise not visible to the casual visitor. <br /> All of the committee members that walked the streets identified the overhead utility lines as an <br /> unnecessary blight that creates a feel of disorganization throughout the downtown. Burying <br /> these lines while the roads are under reconstruction will be simple and will have a significant, if <br /> subtle,impact. <br /> Vegetation Enhancements <br /> While the entrance to Pequot Lakes defines it as a forested community,it is important to <br /> maintain that connection throughout the downtown. Amazingly,there are some high-quality <br /> trees throughout the downtown. These should be protected and augmented with younger trees <br /> that will ultimately grow into a prominent position. <br /> There have been a number of landscaping enhancements to the Trail Park in recent years. <br /> Additional landscaping in the park,combined with landscaping in the medians,bump outs and <br /> in planters along the walkways will create an inviting pedestrian feel that will connect people to <br /> the surrounding landscape. <br /> Trail Park Improvements <br /> It was reported a number of times that some visitors have turned down the Paul Bunyan Trail in <br /> their cars, mistaking it for Government Drive. While certainly a safety hazard,it also points out <br /> the lack of definition of the separate auto and pedestrian spaces in the downtown. The trail <br /> pathway needs to be defined as it crosses CSAH ii,and the entrances to the trail at these <br /> crossings needs to be marked in a way that gives confidence to bikers and pedestrians and <br /> discourages accidental automobile use. <br /> There is also a need to provide more opportunities for trail users to get off the trail and interact <br /> with the downtown. Simple bike racks would go a long ways towards facilitating this,as would <br /> some well-defined turn off areas that connect to the downtown. <br /> "Destination"Enhancements/Aesthetic Improvements <br /> While a strong collection of shops will be the draw that creates the desired"destination"effect, <br /> there are other improvements that need to be made that would help define or brand Pequot <br /> Lakes. <br /> The landmark bobber water tower enhances Pequot's image as an up-north recreation <br /> destination. Building on this theme, installing a fish-viewing pond stocked with local species, <br /> similar to the State Fair attraction,would be a popular and educational centerpiece to the park. <br /> Pequot Lakes Staff Report <br /> February 20,2014 4 <br />