My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & Z Admin Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2015
>
05-21-2015 Planning Commission Meeting
>
P & Z Admin Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2016 2:12:26 PM
Creation date
4/21/2016 2:12:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 21, 2015 Staff Report Page 4 <br /> <br />REGARDING THE TRANSITION RESIDENTIAL ZONING <br />CLASSIFICATION. COUNCIL MEMBER AKERSON SECONDED THE <br />MOTION. MOTION CARRIED 5-0. <br />9.1. Road Improvement Bids <br /> <br /> Mike Loven stated that he has received quotes from Tri-City Paving for <br />$85,913 and from Anderson Brothers for $83,549.11 for the following road <br />improvement projects: <br /> <br />1. A complete re-construction of the portion of Pequot Blvd. between <br />West Grove Street & West Sibley Street, along with two parking areas on <br />the west side of Sibley Lake Park. <br /> <br />2. A bituminous overlay of Brown Street from South Oak Street to <br />Honeysuckle Street. <br /> <br />3. A bituminous overlay of West Grove Street from Hwy. 371 west to <br />Sibley Lake Park. <br /> <br />4. A bituminous overlay of the entire block of South Heath Street. <br /> <br />5. A bituminous overlay of North Heath Street from Brown Street to <br />West Sibley Street. <br /> <br /> Mike Loven explained that because Anderson Brothers was the low quote, <br />he requested another quote for additional shouldering work with top-soil & <br />seeding for $10,232.11. <br /> <br /> COUNCIL MEMBER LOUKOTA MOVED TO ACCEPT THE QUOTE FROM <br />ANDERSON BROTHERS FOR $93,781.60 TO COMPLETE THE ROAD <br />PROJECTS LISTED ABOVE. COUNCIL MEMBER AKERSON <br />SECONDED THE MOTION. MOTION CARRIED 5-0. <br /> <br />9.2. Request for Engineering Proposal for Improvements to Pequot Boulevard <br /> <br /> Mike Loven requested approval for an engineering proposal from WSN to <br />look at design and estimated costs for an upgrade of Pequot Boulevard from <br />West Lake Street to Ramsey Street. <br /> <br /> COUNCIL MEMBER LOUKOTA MOVED TO AUTHORIZE WSN TO <br />DRAFT A PROPOSAL FOR THE UPGRADE OF PEQUOT BOULEVARD <br />FROM WEST LAKE STREET TO RAMSEY STREET. MAYOR SJOBLAD <br />SECONDED THE MOTION. MOTION CARRIED 5-0. <br /> <br />9.3. Request to Petition for Improvements to North Sluetter Road <br />
The URL can be used to link to this page
Your browser does not support the video tag.