Laserfiche WebLink
PEQUOT LAKES PARK COMMISSION <br />THURSDAY, JULY 11, 2013 <br />CITY HALL <br />Members Present: Commissioners Ettesvold, Nagel, Bruch, and Gibbons <br />Members Absent: Chair Malecha <br />Also Present: Sandy Peine, City Clerk; Mike Loven, Public Works <br />Supervisor; Council Liaison Tyler Gardner; and Mayor Nancy <br />Adams <br />Call Meetinq to Order <br />Commissioner Bruch called the meeting to order at 4:00 p.m. <br />2. Consider Aqenda <br />The agenda was approved. <br />3. Park Commission Minutes <br />COMMISSIONER GIBBONS MOVED TO APPROVE THE 6/13/2013 <br />PARK COMMISSION MINUTES. COMMISSIONER ETTESVOLD <br />SECONDED THE MOTION. MOTION CARRIED 4-0. <br />5. Trailside Park <br />Bike Racks - Mike Loven asked the Commissioners to confirm the <br />location of the bike racks and the material and shape of the bike <br />rack pads. After much discussion, the Park Commission indicated <br />that they would like the bike racks to be located at the Crosswalks <br />and that the pads should be made of concrete in a rectangular <br />shape. <br />COMMISSIONER GIBBONS MOVED TO AUTHORIZE MIKE <br />LOVEN TO INSTALL THE BIKE RACKS AT THE CROSSWALKS <br />WITH THE BIKE PADS MADE OF CONCRETE AND IN A <br />RETANGULAR SHAPE. COMMISSIONER ETTESVOLD <br />SECONDED THE MOTION. MOTION CARRIED 4-0, <br />• Irriqation System — Mike Loven informed the Commission that the <br />irrigation system on the north end of Trailside Park has been <br />installed and is working. <br />• Trailside Park Acquisition Update — Clerk Peine stated that she is <br />still working with the DNR to finalize the City's acquisition of <br />Trailside Park. <br />