My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02 - Public Works Garage
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2013
>
07-02-2013 Council Meeting
>
09.02 - Public Works Garage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2014 2:40:53 PM
Creation date
12/16/2013 3:08:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of <br />Pequot <br />Lakes <br />AGENDA ITEM #9.2 <br />REPORT TO <br />CITY COUNCIL <br />Report Prepared by: Mike Loven, Public Works Supervisor <br />Date: July 2, 2013 <br />Subiect: Public Works Garage <br />Report: Since the City purchased and re-modeled the City <br />Hall building there have been many additions to the duties <br />of the Maintenance and Water-Sewer Department <br />employees. With all these changes have come more pieces <br />of equipment needed to complete the tasks, and the need <br />for a place to store them. Some of this equipment needs to <br />be kept in a heated building with floor drains to prevent <br />flooding. Flooding occurs when vehicles and/or equipment <br />are brought in from snow removal. Currently, there is not <br />enough garage floor area with drain to do this. Large areas <br />of both ends of the PD, FD and Maintenance Garages are <br />covered with water after each plowing or snow hauling <br />event. <br />An additional garage area could solve these problems <br />for now and well into the future. With building on the <br />
The URL can be used to link to this page
Your browser does not support the video tag.