Laserfiche WebLink
March 30, 2016 WIDSETH <br /> Proposal for Pequot Blvd Construction Phase SMITH <br /> City of Pequot Lakes <br /> Page 3 11hi NOLTING <br /> .......................................................................................................................................................... <br /> Proposed by Widseth Smith Nolting <br /> Kevin B. Wernberg, Executi a Vice President <br /> Accepted by the City of Pequot Lakes: The above proposal is satisfactory and WSN is <br /> authorized to do the work as specified and in accordance with the attached General Conditions. <br /> Payment will be made monthly in accordance with the terms on the attached fee schedule. <br /> Printed Name Title <br /> Signature Date <br /> Printed Name Title <br /> Signature Date <br /> \\wsn-mn.loc\Filer\Marketing\Marketing Dept\Proposals\00 Letter Proposals\2016 Letter Proposals\Pequot Lakes-Pequot Blvd <br /> Constr Phase.docx <br />