My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.03 - North Washington Street
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2013
>
06-04-2013 Council Meeting
>
09.03 - North Washington Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2014 11:04:09 AM
Creation date
12/3/2013 5:40:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
May 29, 2013 <br />Proposal for North Washington Street <br />City of Pequot Lakes <br />Page 3 <br />• Prepare construction drawings, including typical sections, plans, profiles, details, erosion <br />control sheets, work zone traffic control sheets, and cross sections as needed. <br />• Prepare construction specifications / Contract Manual. <br />• Estimate quantities and prepare a construction cost estimate. <br />It is important to note that as with any construction, there may need to be modifications <br />made to the quantities in the field. As such, we recommend the City set aside a contingency <br />of about 10% of the contractor's bid. <br />• Assist the City in obtaining a MF'CA General Stormwater Permit (if needed), including <br />preparation of a storm water pollution prevention plan (SWPPP). <br />• Complete a Gopher State One Call, as required by State Law, prior to the bid. <br />• Prepare an Advertisement for Bids and assist the City in distributing plans to bidders. <br />• Attend the Bid Opening and review bids with the City. <br />• Compute points and provide construction staking of sanitary sewer improvements. <br />• Compute points and provide construction staking of west edge, centerline, and east edge <br />subgrade. <br />• Compute points and provide construction staking of back of curb west side, centerline top of <br />Class 5, and back of curb east side. <br />• Prepare partial pay estimates during construction (anticipated maximum two month long <br />construction period — say three pay estimates). <br />• It is our understanding the City will administer and observe construction. We will be on-call <br />as an additional service should our assistance be needed by City Staff. <br />At the earliest, and this may be optimistic, we anticipate that construction will occur after Labor <br />Day 2013. This should help minimize — but not eliminate — impact to businesses. Depending on <br />weather, re-establishment of vegetation will most likely extend into the next year. Should <br />decisions on the scope of improvements take more time, the improvements would be <br />constructed in 2014. <br />We propose to perForm the above tasks on an hourly basis, in accordance with the attached fee <br />schedule, for an estimated amount of $30,150. <br />Services that need to be performed in addition to the tasks listed above will be reviewed with the <br />City staff or Council and charged in accordance with our attached fee schedule. <br />N:1Marketing DeptlProposalsl.Letter Proposals12013 Letter ProposalslPequot Lakes - N Washington St - 20130529.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.