May 29, 2013 <br />Honorable Mayor and Council Members <br />City of Pequot Lakes <br />4638 County Road 11 <br />Pequot Lakes, MN 56472-0361 <br />RE: Proposal for Engineering Services <br />North Washington Street <br />Pequot Lakes, MN <br />Honorable Mayor and Council Members: <br />Brainerd I Baxter <br />7804 Industrial Park Road <br />PO Box 2720 <br />Baxter, MN 56425-2720 <br />Tel: 215-829-51 17 <br />Fax: 218-5 29-2517 <br />W idsethSmithNolting.com <br />We know the Planning Commission and the City Council have had several ideas on the layout <br />of a reconstruction of North Washington Street from Main Street (County State Aid Highway — <br />CSAH — 11) to Oriole Street. <br />Following is our best understanding of the level of improvements and our corresponding scope <br />of services. <br />We will be at your June 4 City Council meeting and look forward to your feedback so that we <br />can adjust this proposal, if needed, and provide you the most economical and efficient level of <br />service. <br />• Research property corners, and locate horizontal and vertical survey control. <br />• Make a Gopher State One Call and preferably obtain fieid information from utilities, but if not <br />provided, obtain design maps from them. <br />• Field survey all underground and above ground features to prepare a base map. <br />• Remove and replace existing sanitary sewer (Public Works said existing watermain is okay <br />to remain). If the City has televising, that will help minimize unknowns. <br />• Washington Street's existing drainage — one grate inlet — connects to the County's CSAH 11 <br />/ Main Street storm sewer system. We will look into this in more detail, but we do not <br />anticipate significant changes in impervious surface from before these improvements to after <br />these improvements. <br />We will talk to the County about the improvements, but we are not anticipating in our effort <br />having to upsize the storm sewer system in CSAH 11 / Main Street. Should the County <br />require this or something similar, we will re-visit the scope with the City Council. <br />Design a new storm sewer system of catch basins and piping in Washington Street for the <br />purposes of positive drainage — not necessarily based on a certain size storm. <br />w����� <br />OLi'ItvSa <br />engineering archifecture ! land surveying environme�tal services <br />