My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.04 - Draft Reissued State Disposal System Permit (SDS)
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2016
>
01-05-2016 Council Meeting
>
09.04 - Draft Reissued State Disposal System Permit (SDS)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:46:48 PM
Creation date
12/30/2015 3:40:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Permit issued: To Be Determined <br /> Permit expires. To Be Determined Page 9 of 46 <br /> LA 301 Application Site, <br /> Spray with Soils <br /> Tests <br /> Facility Specific Limit and Monitoring Requirements <br /> 55 1 The Permittee shall submit a monthly DMR Due by 21 days after the end of each <br /> calendar month following permit issuance [Minn R 7001 0150,Subp 2(B)] <br /> 55 2 Sampling Location [Minn R 7001 0150,Subp 2(13)] <br /> 5 5 3 Samples for station LA301 shall be taken at the 50 acre South Spray Site [Minn R <br /> 7001 0150, Subp 2(B)] <br /> 5 5 4 The Permittee shall submit monitoring results in accordance with the limits and <br /> monitoring requirements for this station If conditions are such that no sample can be <br /> acquired,the Permittee shall report"No Flow" or"No Discharge"on Discharge <br /> Monitoring Report(DMR)and shall add a Comments attachment to the DMR detailing <br /> why the sample was not collected [Minn R 7001 0150,Subp 2(B)] <br /> LA 302 Application Site, <br /> Spray with Soils <br /> Tests <br /> Facility Specific Limit and Monitoring Requirements <br /> 5 6 1 The Permittee shall submit a monthly DMR Due by 21 days after the end of each <br /> calendar month following permit issuance [Minn R 7001 0150,Subp 2(13)] <br /> 5 6 2 Sampling Location [Minn--R 70010_150,Subp- 2(B)] <br /> 56.3 Samples for station LA302 shall betaken at the 50 acre West Spray Site [Minn R <br /> 7001.0150,Subp 2(13)] <br /> 5 6 4 The Permittee shall submit monitoring results in accordance with the limits and <br /> monitoring requirements for this station If conditions are such that no sample can be <br /> acquired,the Permittee shall report"No Flow"or"No Discharge" on Discharge <br /> 'Monitoring Report(DMR) and shall add a Comments attachment to the DMR detailing <br /> why the sample was not collected [Minn R 70010150,Subp. 2(13)] <br /> LA 303 Application Site, <br /> Spray with Soils <br /> Tests --- <br /> Facility Specific Limit and Monitoring Requirements <br /> 5 7 1 The Permittee shall submit a monthly DMR Due by 21 days after the end of each <br /> calendar month following permit issuance [Minn. R. 7001 0150,Subp 2(13)] <br /> 572 _ Sampling Location [Minn R 7001 0150,Subp 2(B)]- <br /> 573 Samples for station LA304 shall be taken at the 45 3 acre South Derksen Road Spray <br /> Site [Minn R 7001_0150,Subp 2(B)] <br /> 574 The Permittee shall submit monitoring results in accordance with the limits and <br /> monitoring requirements for this station If conditions are such that no sample can be <br /> acquired,the Permittee shall report"No Flow" or"No Discharge"on Discharge <br /> Monitoring Report(DMR)and shall add a Comments attachment to the DMR detailing <br /> why the sample was not collected [Minn R 7001 0150,Subp 2(13)] <br /> LA 304 Application Site, <br /> Spray with Soils <br /> Tests -_- <br /> Facility Specific Limit and Monitoring Requirements <br /> 5 8 1 The Permittee shall submit a monthly DMR Due by 21 days after the end of each <br /> calendar month following permit issuance [Minn R 7001 0150,Subp 2(13)] <br /> 5 8 2 Sampling Location [Minn R 7001 0150, Subp 2(13)] <br />
The URL can be used to link to this page
Your browser does not support the video tag.