Laserfiche WebLink
Permit issued- To Be Determined <br /> Permit expires- To Be Determined Page 8 of 46 <br /> 4 Permit requirements <br /> GW 004 Well,Downgradient <br /> Groundwater Well:Monitoring Requirements <br /> 5 11 The Permittee shall submit a monthly DMR .Due by 21 days after the end of each <br /> calendar month following permit issuance [Minn R 7001 0150,Subp 2(B)] <br /> 5 12 Sampling Location [Minn R 7001 0150, Subp 2(13)] <br /> 5 13 Samples for station GWO04 shall be taken at ground water monitoring well#4 [Minn <br /> j R 7001 0150,Subp 2(13)] <br /> 5 14 The Permittee shall submit monitoring results in accordance with the limits and <br /> monitoring requirements for this station. If conditions are such that no sample can be <br /> acquired,the Permittee shall report"No Flow" or"No Discharge" on Discharge <br /> Monitoring Report(DMR)and shall add a Comments attachment to the DMR detailing <br /> why the sample was not collected [Minn R 7001 0150,Subp 2(B)] <br /> GW 005 !Well, Downgradient <br /> Groundwater Well. Monitoring Requirements <br /> 52 1 The Permittee shall submit a monthly DMR Due by 21 days after the end of each <br /> calendar month following permit issuance [Minn. R 7001 0150,Subp 2(B)] <br /> 1 5 2 2 Sampling Location. [Minn R 7001 0150, Subp 2(13)] <br /> 5 23 Samples for station GWO05 shall be taken at ground water monitoring well#5 [Minn <br /> R 7001 0150, Subp 2(B)] <br /> 5 2 4 The Permittee shall submit monitoring results in accordance with the limits and <br /> monitoring requirements for this station If conditions are such that no sample can be <br /> acquired,the Permittee shall report"No Flow"or"No Discharge" on Discharge <br /> Monitoring Report(DMR) and shall add a Comments attachment to the DMR detailing <br /> why the sample was not collected [Minn R 7001 0150,Subp 2(B)] <br /> GW 006 Well,Upgradient <br /> Groundwater Well-Monitoring Requirements <br /> 53 1 The Permittee shall submit a monthly DMR • Due by 21 days after the end of each <br /> calendar month following permit issuance [Minn R 7001 0150,Subp 2(13)] <br /> 5.3 2 Sampling Location [Minn R 7001 0150,Subp 2(B)] <br /> 5 3 3 Samples for station GWO06 shall be taken at ground water monitoring well#6 [Minn <br /> R 7001 0150,Subp 2(B)] <br /> 5 3 4 The Permittee shall submit monitoring results in accordance with the limits and <br /> monitoring requirements for this station If conditions are such that no sample can be <br /> acquired,the Permittee shall report"No Flow" or"No Discharge"on Discharge <br /> Monitoring Report(DMR) and shall add a Comments attachment to the DMIR detailing <br /> why the sample was not collected [Minn R 7001 0150,Subp 2(13)] <br /> GW 010 Well,Upgradient <br /> Groundwater Well. Monitoring Requirements <br /> 54 1 The Permittee shall submit a monthly DMR Due by 21 days after the end of each <br /> (calendar month following permit issuance [Minn R 7001 0150,Subp 2(B)] <br /> 5 4 2 Sampling Location [Minn R 7001 0150, Subp 2(13)] <br /> 5 4 3 Samples for station GWO10 shall be taken at ground water monitoring well#10 <br /> [Minn R 7001 0150, Subp 2(13)] <br /> 5 The Permittee shall submit monitoring results in accordance with the limits and <br /> monitoring requirements for this station If conditions are such that no sample can be <br /> acquired,the Permittee shall report"No Flow" or"No Discharge" on Discharge <br /> Monitoring Report(DMR) and shall add a Comments attachment to the DMR detailing <br /> why the sample was not collected [Minn R 7001 0150,Subp 2(13)] <br />