Laserfiche WebLink
project, although it could possibly fit in as a late (after <br />Labor Day) 2013 construction project. <br />CSAH 11 Gateway from existin� stopli�ht to future 4-lane <br />Hwy 371 intersection <br />We understand P&Z is talking about this segment and the <br />desired layout (design even) and amenities. <br />We are available to assist with engineering items as <br />directed. <br />Other Future 4-lane Hwy 371 related items <br />We have heard that the County will be / are talking to <br />MnDOT about its turnbacks, and the County wants to <br />engage the City on its possible turnbacks — for example, the <br />present Hwy 371. <br />We have worked with cities and counties on turnbacks, so <br />we will work with the City to whatever level you want us to <br />be involved. <br />Related, we have met with the MPCA and the City on <br />impacts to the spray irrigation field by the 4-lane Hwy 371, <br />and how the City might want to proceed with any <br />modifications or improvements to their wastewater <br />system's components. We have provided Mike info on <br />rapid infiltration basins — this being one possible <br />alternative. Again, we will work with the City to whatever <br />level you want us to be involved. <br />Council Action Requested: No action requested. <br />