My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02 - City Engineer Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2013
>
05-07-2013 Council Meeting
>
09.02 - City Engineer Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2014 9:16:59 AM
Creation date
12/3/2013 5:22:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ci ty of <br />Pequot <br />Lakes - <br />AGENDA ITEM #9.2 <br />REPORT TO <br />CITY COUNCIL <br />Report Prepared by: Tim Houle, City Engineer <br />Date: May 7, 2013 <br />Subiect: City Engineer Update <br />Report: Government Drive - As load limits start to come <br />off, we will work with Tri-City Paving to close this project <br />out. <br />Nelson Road <br />Due to the lateness in the snow leaving us, our surveying <br />took longer than anticipated. We will be working on the <br />design in the next couple of months with it being a possible <br />2014 construction proj ect. <br />Washin�ton Street <br />We want to be responsive to all the comments at the P&Z <br />discussions on this as we put together a written scope of <br />work and engineering proposal, but it is challenging. We <br />hope to review this with the Council at the meeting. We <br />understand that this will most likely be a 2014 construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.