Laserfiche WebLink
Ci ty of <br />Pequot <br />Lakes - <br />AGENDA ITEM #9.2 <br />REPORT TO <br />CITY COUNCIL <br />Report Prepared by: Tim Houle, City Engineer <br />Date: May 7, 2013 <br />Subiect: City Engineer Update <br />Report: Government Drive - As load limits start to come <br />off, we will work with Tri-City Paving to close this project <br />out. <br />Nelson Road <br />Due to the lateness in the snow leaving us, our surveying <br />took longer than anticipated. We will be working on the <br />design in the next couple of months with it being a possible <br />2014 construction proj ect. <br />Washin�ton Street <br />We want to be responsive to all the comments at the P&Z <br />discussions on this as we put together a written scope of <br />work and engineering proposal, but it is challenging. We <br />hope to review this with the Council at the meeting. We <br />understand that this will most likely be a 2014 construction <br />