My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.01 - Planning Commission Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2015
>
07-07-2015 Council Meeting
>
06.01 - Planning Commission Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2015 2:49:56 PM
Creation date
7/2/2015 2:49:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES <br /> PEQUOT LAKES PLANNING COMMISSION <br /> REGULAR MEETING <br /> JUNE 18, 2015 <br /> PRESENT: Deb Brown,Todd Engels, Bill Habein, Mark Hallan,James Oraskovich and <br /> Wesley Wilson. ABSENT: Cheri Seils. <br /> CITY PLANNER: Justin Burslie, NJPA <br /> ZONING ADMINISTRATOR: Dawn Bittner <br /> COUNCIL LIAISONS: Jerry Akerson and Randy Loukota <br /> The meeting was called to order by Vice Chair Brown at 6:00 p.m. <br /> PRE-MEETING DISCUSSION: <br /> a. Comprehensive Plan — Review Transportation Section <br /> Mr. Burslie explained the construction of the alternate alignment of State Highway 371 <br /> will become a reality in the very near future. The Transportation Section of the <br /> Comprehensive Plan should be reviewed. <br /> Mr. Burslie stated the City may be asked to look at the land use in the area of the <br /> alternate alignment,specifically the four corners of the interchange. The <br /> Comprehensive Plan made a point of stating that development should happen in our <br /> core rather than sending water and wastewater lines out to the interchange. <br /> Planning Commission Member Habein stated the City cannot afford to run <br /> infrastructure to that area. <br /> The Donjek Report from the Highway 371 Alternate Route Study Group will be included <br /> in the July packets. <br /> The assumption is that all four corners could be developed commercially,but not all <br /> four could be developed. The northeast corner is the Fire Tower and zoned Recreational <br /> and the southeast corner is right-of-way and the new frontage road to Benvelle and the <br /> sewer ponds. <br /> MINUTES 1 <br /> Pequot Lakes Planning Commission <br /> June 18,2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.