My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02 - Turn Back Memorandum of Agreement
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2015
>
06-16-2015 Special Council Meeting
>
02 - Turn Back Memorandum of Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2015 2:50:07 PM
Creation date
6/11/2015 2:23:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Roadway Turn Back Memorandum of Agreement <br /> Crow Wing County and Pequot Lakes <br /> AGREEMENT <br /> The County and City have come to a tentative agreement on the momentary obligation of both parties <br /> regarding the proposed roadway turn backs and interchange. This agreement will not be considered <br /> final until each elected body has acted on the formal turn back document to be drafted on a later date. <br /> The City tentatively agrees to accept future jurisdiction of portions of TH 371, CSAH 11 and CR 112 <br /> in exchange for monetary consideration summarized Table 1. The City agrees to accept a lump sum <br /> payment in one or more installments in lieu of cooperative construction projects. <br /> Table 1 <br /> Segment Funding Source Amount Notes <br /> MnDOTTurn Back Full amount paid by MnDOTto County will be <br /> Existing TH 371 from CR 107/168 to CSAH 17 $4,200,000 <br /> Funds transferred to City <br /> All segments of CSAH 11 west of the future <br /> Crow Wing County Lump sum County payment based on future <br /> bypass/interchange including west of current $ 659,000 <br /> TH 371 alignment.Includes signal system. funds construction needs <br /> All segments of CR 112 west of the future <br /> Crow Wing County Lump sum County payment based on future <br /> bypass/interchange including new alignment $ 893,000 <br /> north of East Grove Street funds construction needs <br /> Diamond Interchange City funds $ (372,000) Estimated City obligation for interchange=6%of <br /> total cost($6.2M Estimate) <br /> 'fiadtet*ili,:tiMitaind441.12 <br /> WITNESS <br /> CROW WING COUNTY CITY OF PEQUOT LAKES <br /> By: By: <br /> Timothy Bray, P.E. David Sjoblad, <br /> Crow Wing County Engineer Mayor, City of Pequot Lakes <br /> Date: Date: <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.