Laserfiche WebLink
considering the future use of the park. The cost of a one <br /> stall restroom is about $47,000. The cost of a two stall <br /> restroom is approximately $88,000. The Park Commission <br /> reviewed possible funding options. <br /> The Commission also reviewed the design of the restroom. <br /> It was the consensus to go with the design as shown on the <br /> attachment. <br /> The Commission voted to recommend that the City Council <br /> move forward with the construction of a two stall public <br /> restroom facility at $88,000, using the funds as stated on <br /> the attached spreadsheet. <br /> If the funding is used per the attached spreadsheet, there is <br /> still a possible shortage of$14,000. <br /> The Commission also discussed the location of the <br /> restroom. It was a consensus of the Commission to locate <br /> the facility at the bottom of the hill rather than at the top of <br /> the hill next to the picnic shelter. <br /> Council Action Requested: <br /> 1. Council motion to approve the proposal for design <br /> services for Trailside Park Seasonal Public Restroom <br /> Facility submitted by WSN at an estimated cost of$10,600. <br /> 2. Council decision on moving forward with the <br /> construction of a two stall restroom at approximately <br /> $88,000 and to determine funding options. <br />