Laserfiche WebLink
City of <br /> Pe ?__ AGENDA ITEM #9.1 <br /> - <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Mike Loven, Public Works Supervisor <br /> Date: April 7, 2015 <br /> Subject: Trailside Park Restroom <br /> Report: The Park Commission has been studying the <br /> design and layout of a restroom to be located in Trailside <br /> Park. WSN has submitted an engineering proposal for <br /> design services of the restroom facility. The cost of the <br /> WSN proposal is an estimated fee of$10,600. The Park <br /> Commission is recommending that the Council approve the <br /> proposal for design services from WSN. <br /> Two members of the Park Commission reviewed the <br /> proposal with WSN. The two members also toured a public <br /> restroom facility in Baxter that was designed by WSN. <br /> The Park Commission held a special meeting on Thursday, <br /> April 2nd to discuss the design of the restrooms. The <br /> consensus of the Commission is that a restroom with two <br /> stalls for women and two for men is necessary especially <br />