My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 - Trailside Park Restroom
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2015
>
04-07-2015 Council Meeting
>
09.01 - Trailside Park Restroom
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2015 10:39:55 AM
Creation date
4/2/2015 10:39:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of <br /> Pe ?__ AGENDA ITEM #9.1 <br /> - <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Mike Loven, Public Works Supervisor <br /> Date: April 7, 2015 <br /> Subject: Trailside Park Restroom <br /> Report: The Park Commission has been studying the <br /> design and layout of a restroom to be located in Trailside <br /> Park. WSN has submitted an engineering proposal for <br /> design services of the restroom facility. The cost of the <br /> WSN proposal is an estimated fee of$10,600. The Park <br /> Commission is recommending that the Council approve the <br /> proposal for design services from WSN. <br /> Two members of the Park Commission reviewed the <br /> proposal with WSN. The two members also toured a public <br /> restroom facility in Baxter that was designed by WSN. <br /> The Park Commission held a special meeting on Thursday, <br /> April 2nd to discuss the design of the restrooms. The <br /> consensus of the Commission is that a restroom with two <br /> stalls for women and two for men is necessary especially <br />
The URL can be used to link to this page
Your browser does not support the video tag.