My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01.05B - Spray Irrigation Field
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2015
>
03-03-2015 Council Meeting
>
01.05B - Spray Irrigation Field
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2015 9:50:45 AM
Creation date
2/26/2015 9:19:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
March 3, 2015 Page 2 <br /> Proposal for Design of Row Irrigation,Wastewater <br /> Improvements, and Permitting Assistance <br /> City of Pequot Lakes <br /> Research and Preliminary Design <br /> Research and preliminary design for the following: <br /> • Rehabilitation of different components of the existing Gravdahl lift station. <br /> • Addition of a flow meter in the forcemain going out of the Gravdahl lift station to the <br /> stabilization basins. <br /> • Replacing several aerators and associated piping in the stabilization basins. <br /> • Replace one aeriation system blower. <br /> • Since sludge (biosolids) have never been removed from the stabilization basins, remove <br /> and dispose of biosolids. <br /> • We do not anticipate upgrades or replacements to the discharge pumps, but we will add <br /> a new flow meter to the line going out to the discharge field. <br /> • Layout a row irrigation system (4 zones initially anticipated) including performing <br /> preliminary flow and pressure calculations. <br /> Final Design Drawings and Specifications <br /> Performing final design, electrical controls, piping, erosion control/SWPPP, drawings, <br /> specifications, and a cost estimate. <br /> MPCA Submittal and Approval <br /> Prepare necessary construction plan permit application packet, submit, answer any questions <br /> from the MPCA, and incorporate MPCA's comments into the final drawings and specifications. <br /> Public Bidding and Award <br /> Prepare and distribute newspaper and 'construction journal'Ad For Bids, distribute bidding <br /> documents, address bidders' questions, prepare addenda as needed, attend the bid opening, <br /> compile a bid tabulation, forward and review bids with the MPCA and City, and prepare a <br /> Recommendation of Award. <br /> Expenses and Application Fees <br /> This includes mileage, maybe some meals, any special survey or other equipment, and MPCA <br /> application fees on behalf of the City. This does not include newspaper or other advertising <br /> costs. <br /> NOTES <br /> We do not know which, if any, funding assistance entities will be involved. Thus, we will have to <br /> amend this Agreement with any agency/ entity requirements over and above this scope (e.g. <br /> wage rates). <br /> We anticipate the City using existing parcels that are already spray irrigated. Thus, we do not <br /> anticipate needing soil borings, a geotechnical report, or changes in monitoring wells. <br /> J:\01308-City of Pequot Lakes\0130B0053-Pequot Lakes WWTF Facility Plan\0130B0053.000-Pequot Lakes WWTF Facility <br /> Plan\Project Management\20150303-Row Irrigation Design and Permitting proposal.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.