My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.3 Larsen Parkway Extension Proposal - Engineering Services.2
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2023
>
04-03-2023 Council Meeting
>
9.3 Larsen Parkway Extension Proposal - Engineering Services.2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:59:09 PM
Creation date
1/3/2024 2:36:49 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2023 HOTGL Larsen Parkway Extension <br />February 6th, 2023 <br /> <br /> <br />Page 3 of 5 <br /> <br />18. Construction phase material testing is not part of our scope of work. <br />We will assist the City in preparing a Request For Proposal from soil boring-geotechnical <br />engineering firms, review the proposals, and assist the City in contracting directly with such a <br />firm, if needed. <br /> <br />19. Review bids received and provide a Letter of Recommendation to the City, so that the City <br />Council can award the construction Contract. <br /> <br />20. Issue a Notice of Award to the Contractor, and request bonds and insurance. <br /> <br />21. Review the Contractor’s bonds and insurance for conformity to the construction Contract, <br />obtain signatures on the Agreement, and prepare conformed construction Contracts for the <br />City, the Contractor, and our project files. <br /> <br />22. Send out invites, prepare an agenda, conduct the pre-construction meeting, and distribute <br />minutes. <br /> <br />23. Coordinate, in conjunction with the Contractor and the City, with other utilities. <br /> <br />24. Review the Contractor’s schedules. <br /> <br />25. Review the Contractor’s shop drawings on materials to be incorporated into the work. <br /> <br />26. Establish horizontal and vertical control in the field for construction staking and for use by the <br />Contractor. <br /> <br />27. Provide construction staking for sanitary sewer, watermain, storm drainage, roadway grading, <br />and curb and gutter for the Contractor as specified in the construction documents. <br /> <br />28. Provide a construction observer. This person will coordinate with City Public Works Staff when <br />they can observe construction. Due to the type of work and other Public Works Staff duties we <br />anticipate our construction observer will be on-site 5 days a week for 10 hours a day over an <br />estimated 4-week construction schedule. <br /> <br />29. Prepare agendas, conduct weekly on-site progress meetings (if deemed necessary), and <br />distribute minutes. <br /> <br />30. Answer questions from the Contractor, and construction observer.
The URL can be used to link to this page
Your browser does not support the video tag.