My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.01 - Wastewater Treatment Facility Plan - Public Hearing
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2015
>
01-06-2015 Council Meeting
>
05.01 - Wastewater Treatment Facility Plan - Public Hearing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2014 2:54:13 PM
Creation date
12/31/2014 10:01:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pequot Lakes Facility Plan <br /> For <br /> Wastewater Treatment Facility(WWTF) Effluent Disposal Options <br /> Public Hearing <br /> January 6,2015,6:00 p.m. <br /> Pequot Lakes City Hall <br /> A3. Row Irrigation System <br /> Replace center pivot moving irrigators with a series of stationary row irrigators. <br /> It was not pursued in detail, but costs are anticipated to be closer to the above two options than <br /> other options. <br /> B. Rapid Infiltration Basins (RIB's) <br /> Remove the spray irrigation,sell the land west of the new highway, add additional aeration next <br /> to the stabilization basins,and construct six RIB's(each roughly 100 feet by 175 feet) on the east <br /> side of the new highway and south of the stabilization basins. <br /> Estimated initial project cost of$1.75 million (can fluctuate based on land sale price) <br /> C. Pipe to Pine River Area Sanitary District(PRASD) <br /> Remove the present WWTF, sell all the land,enter into a treatment agreement, and pipe the <br /> City's wastewater north a little over 9 miles to PRASD. <br /> Estimated initial project cost of$3.3 million (can fluctuate based on land sale price) <br /> D. Offsite Surface Disposal Options <br /> Instead of spray irrigation, pipe the discharge to nearby lakes or the Preserve Golf Course. <br /> Due to additional treatment and permit issues,these options were not pursued further. <br /> E. Subsurface Disposal <br /> Instead of spray irrigation,this would consist of a series of perforated underground piping on <br /> the present spray irrigation land. <br /> Due to additional treatment and permit issues,this option was not pursued further. <br /> Selected Alternative <br /> The lowest estimated present worth (includes 20 years of O&M)was A2—Spray Pivot Irrigators with <br /> Additional Land.The second lowest estimated present worth was B—RIB's. <br /> Mainly due to keeping all operations on the east side of the new highway,the City is pursuing the RIB's. <br /> Estimated Sewer Service Charges <br /> Terms and rates vary greatly across funding assistance agencies. <br /> $1.75 million,40 years, 3.5%, plus 5%debt service reserve=$85,850 per year. <br /> $85,850/25 million gallons per year $0.003434 per gallon. <br /> The average residential customer generates about 32,350 gallons per year,or 2,700 gallons per month. <br /> $0.003434 per gallon x 32,350 gallons per year=$111 per year,or about$9.25 per month. <br /> NOTE:This assumes no grants or up-front investment from City savings. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.