My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.3 Front and Main Street with NW Area Study Proposal
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2023
>
11-06-2023 Council Meeting
>
9.3 Front and Main Street with NW Area Study Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 12:59:14 PM
Creation date
12/6/2023 12:42:08 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
November 1. 2023 <br />Study of the NW Area <br />City of Pequot Lakes <br />Page 3 <br />Final Figures <br />We would take feedback from the City Committee and update the Figures. <br />These can be used for Planning & Zoning and future inquiries. <br />Estimated Costs <br />WiDSETH <br />We will prepare a high -level cost estimate (aggregate "per foot" type estimated costs and <br />percentage -based costs). <br />This can be used for future budgeting purposes. <br />Present to the City Council <br />We will present the Figures and Estimated Costs to the City Council. <br />We anticipate some feedback from the Council. <br />We will take that feedback and prepare Final Figures and a Final Cost Estimate. <br />Fee <br />We have yet to set our 2024 Fee Schedule. However, we have incorporated estimates of those <br />adjustments so that there will be no adjustment in our fee (short of a change of scope). <br />Our fee to provide all of the above services is a lump sum amount of $18,950. <br />If we need to provide services other than those listed above, we will first review the scope and <br />effort with the City Staff and with the Council. <br />Schedule <br />Based on timelines to do the work, City budgets, and other City improvements, we understand <br />these possible improvements (Main Street and Front Street; and maybe some within the NW <br />Area) would be constructed in 2025. <br />That might seem far into the future, however, it will come up on all of us quicker than we think. <br />Thus, we intend to complete this NW Area Study as quickly as possible — as fast as the City <br />Committee can provide us guidance. <br />Aareement <br />We plan on being at your November 6th City Council meeting to discuss this proposal and, if <br />needed, adjust it so we can provide you a responsive and appropriate level of service. <br />WMarketing Dept\Proposals100 Letter ProposalsQ023 Letter ProposalsTequot Lakes NW Area Amend\Pequot Lakes - NW Area Study Amendment - <br />20231101.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.