My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.3 Front and Main Street with NW Area Study Proposal
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2023
>
11-06-2023 Council Meeting
>
9.3 Front and Main Street with NW Area Study Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2023 12:59:14 PM
Creation date
12/6/2023 12:42:08 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
November 1, 2023 <br />Honorable Mayor and Council Members <br />City of Pequot Lakes <br />4638 Main Street <br />Pequot Lakes, MN 56472 <br />RE: Proposal for Engineering Services <br />Study of the NW Area <br />Pequot Lakes, MN <br />Honorable Mayor and Council Members: <br />WIDSETH <br />Brainerd /Baxter <br />7804 Industrial Park Road <br />Baxter MN 56425 <br />218.829.5117 <br />Baxter ®Widseth.com <br />Widseth.com <br />In response to your direction at the last Council Meeting, related to potential development, <br />following is our proposal for engineering services on the above referenced item. <br />Scooe of Improvements <br />The general scope of our work will be a high -level ( "30,000 feet ") Study of possible future <br />wastewater system, water system, stormwater management, and street network improvements. <br />The Study area will be bounded by Main Street on the south, MN State Highway 371 on the <br />east, County State Aid Highway 17 on the north, and Rasmussen Road on the west. <br />This area is referred to as the "NW Area ". <br />At your July 2021 meeting, the City Council approved a Study of improvements to Main Street <br />(from the Hwy 371 western roundabout and then to the west) and Front Street (from Patriot <br />Avenue down to Main Street). After approving the Study, the Council asked that we hold / not <br />proceed with the Study until the City worked through possible improvements in the Trailside <br />Park and Patriot Avenue corridor. <br />With recent interest in the southern and eastern portion of the NW Area, it would be beneficial to <br />proceed with both the 2021 Main and Front Study and this NW Area Study. <br />The following are shown as discrete tasks. However, they are all inter - related and there is much <br />back - and -forth between them. <br />Wastewater System <br />Using publicly available contour information (e.g. LiDAR), we will review where lift stations could <br />be located. <br />We would then layout a "backbone" gravity sanitary sewer collection system. <br />Engineering I Architecture Surveying <br />Environmental <br />
The URL can be used to link to this page
Your browser does not support the video tag.