November 3, 2014 WIDSETH <br /> Proposal for Old 371 —Main to Rae LIII147 City of Pequot Lakes SMITH <br /> Page 5 , NOLTING <br /> 15. Possibly create an existing Gravdahl infiltration basin overflow via a culvert under Gravdahl <br /> to a grassed swale to the south past the City lift station and then to the east towards a <br /> natural low area. <br /> If an overflow of this basin is needed, and after review with the City on the scope and <br /> effort, we would design overflow improvements and work with the City on permanent <br /> easement definition and acquisition as an Additional Service. <br /> 16. Design the curb and guttered street and sidewalks; including the time necessary to account <br /> for Americans With Disabilities Act(ADA) requirements. <br /> 17. There are a couple locations where it appears there could be some elevation difference. We <br /> anticipate using grading to account for these. <br /> Should retaining walls be needed, we would first review the scope and effort with the <br /> City and treat it as an Additional Service. <br /> 18. Design and incorporate necessary connection to MN Power, service cabinet, foundations, <br /> conduit, wiring, and ornamental street lights (same as used on the 2014 North Washington <br /> project). <br /> 19. Incorporate trees behind the curb/in grassed boulevards. Our intent is to use a variety or <br /> varieties that minimize root impact on sidewalks. <br /> 20. As indicated, from Crow Wing County's GIS website, it looks like for the majority of the <br /> corridor there is only 33 feet of"recorded" R/W. We will review old MnDOT documents for <br /> any turn back agreements to the County. <br /> Once we determine the status of R/W, we can make a decision on the scope and effort <br /> needed as an Additional Service. It may be assisting the City on properly recording <br /> documents already showing 66 feet of RNV. It may be preparing Sketches and <br /> Descriptions for an additional 33 feet of R/W, assisting the City in acquiring this from the <br /> adjacent property owners, and getting them properly recorded. <br /> 21. While we are adding some new impervious surface, initially, it does not appear to be a <br /> significant amount. However, we will assist the City in obtaining a MPCA General <br /> Stormwater Permit(as needed), including preparation of a storm water pollution prevention <br /> plan (SWPPP). <br /> 22. Prepare construction drawings, including typical sections, plans, profiles, details, erosion <br /> control sheets, work zone traffic control sheets, and cross sections as needed. <br /> 23. Prepare construction specifications/Contract Manual. <br /> 24. Estimate quantities and prepare a construction cost estimate. <br /> It is important to note that as with any construction, there may need to be modifications <br /> made to the quantities in the field. As such, we recommend the City budget a <br /> contingency of about 10% of the contractor's bid. <br /> 25. Complete a Gopher State One Call, as required by State Law, prior to the bid. <br /> N:\Marketing Dept\Proposals\.Letter Proposals\2014 Letter Proposals\Pequot Lakes-Old 371 -20141103.docx <br />