My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11.01 - Street Light Installation
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2008
>
11-06-2008 Council Meeting
>
11.01 - Street Light Installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2014 1:59:02 PM
Creation date
10/23/2014 1:59:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 of 3 <br /> Dimensions of proposed permanent easement = 1,000 ft x 33 ft <br /> Area of proposed permanent easement = 33,000 square feet <br /> Estimated value of proposed permanent easement = $10,560 <br /> As I said Mr. Babinski accepted the above as long as we include a statement that he will not <br /> be assessed for these improvements. <br /> I'm not sure if this would require any specific approval, but does the City concur with such an <br /> Agreement in concept, have the City Attorney draft such an agreement, and get it to Mr. <br /> Babinski? <br /> 3. Related to the South Oak Street project, I would like to just give the Council a "heads up" <br /> on our intent for the December Council meeting. <br /> First, once the scope is better known with the School and Mr. Babinski, we will complete our <br /> report on the proposed South Oak improvements with a letter report and cost estimate. <br /> Second, we would also intend to bring an engineering services agreement to provide final <br /> design, bidding phase assistance, and construction phase assistance services. <br /> We would hope we could perform the design, get Council approval, and go to bid as early as <br /> we can in 2009 (I will guess and say February). Our intent is to get construction going as soon <br /> as possible and finish up well before the high school football season. <br /> End of Report <br /> COMPANY OVERVIEW I CONTACT US <br /> Timothy Houle, PE <br /> Civil Engineer,Vice President <br /> TEL:218.316.3646 <br /> CELL:218.820.7479 <br /> EMAIL:tim.houle @wsn-mn.com WIDSETH <br /> 7804 Industrial Park Road SMITH <br /> Baxter, MN 56425 N ING <br /> TEL:218.829.5117 „p,EE0 <br /> FAX:218.829.2517 <br /> Download My Contact Info as V-Card I www.wsn-mn.com <br /> ENGINEERING I ARCHITECTURE I LAND SURVEYING I ENVIRONMENTAL SERVICES <br /> ALEXANDRIA I BEMIDJI I BRAINERD/BAXTER I CROOKSTON I GRAND FORKS <br /> This email and any files transmitted with it are confidential and are intended solely for the use of the individual or entity to whom they are addressed. <br /> If you are NOT the intended recipient or the person responsible for delivering the e-mail to the intended recipient,be advised that you have received <br /> this e-mail in error and that any use,dissemination,forwarding,printing,or copying of this e-mail is strictly prohibited. <br /> This email has been scanned for viruses by Widseth Smith Nolting using Fortinet(TM)and McAfee(TM)Anti-Virus Technologies. <br /> 11/5/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.