My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08 - Water/Wastewater Monthly Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2008
>
11-06-2008 Council Meeting
>
08 - Water/Wastewater Monthly Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2014 3:33:58 PM
Creation date
10/22/2014 3:33:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Police • ` City of Pequot City Hall <br /> 218-568-8111 <br /> t -� Lakes 218-568-5222 <br /> Fax 218-568-5647 218-568-5860 <br /> �)lpd @pequotlakes-mn.gov 4638 County Road 11 <br /> cityhall@pequotlakes-mn.gov <br /> Pequot Lakes, MN 56472 <br /> www.pequotlakes-mn.gov <br /> Mayor/City Council/City Clerk <br /> Pequot Lakes, MN <br /> Water/Wastewater Report <br /> October 2008 <br /> POTABLE DRINKING WATER <br /> I. Facilities Performance: <br /> Average daily gallons pumped: 105,758 gallons <br /> Maximum daily gallons pumped: 142,000 gallons <br /> Minimum daily gallons pumped: 67,000 gallons <br /> Total monthly gallons pumped: 3,067,000 gallons(as of the 29th) <br /> Average daily chlorine concentration: .26mg/l <br /> Required chlorine concentration: .2 to .5 mg/I <br /> Average daily fluoride concentration: 1.1 mg/1 <br /> Required fluoride concentration: 0.9 mg/I to 1.5 mg/I <br /> Treatment Chemicals Used for the Month: 11.3 gals Fluoride <br /> 23.5 lbs Chlorine <br /> II. Operations and Maintenance: <br /> • The MN Department of Health Monthly Fluoridation Report was completed and <br /> submitted. <br /> • The annual well inspections were completed by Thein Well on October 2"d. The report <br /> was good. <br /> • A new control starter for one of two air compressors was installed by Moonlighting <br /> Electric. <br /> • Water valve shut-off was replaced on Oct.8th, @ 31140 Pequot Blvd. Pratt's Excavating <br /> did the excavation and installation. This valve had been leaking for many years. <br /> • Quarterly samples for fluoride and bacteriological were taken. <br /> • Pratt's excavating replaced curb stop valve @ 31140 Pequot Blvd., since it had been <br /> leaking for years. <br /> • Completed 12 work orders, received 22 locates <br /> WASTEWATER <br /> I. Facility Performance: <br /> a. CBOD Concentration <br /> Influent— mg/1 (Design—250 mg/1) <br />
The URL can be used to link to this page
Your browser does not support the video tag.