Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Mr.Linnell <br /> August 27,2008 <br /> Page 3 of 3 <br /> infields,the bases,the aggregate surfaced parking area, and all grassed areas outside the <br /> permanent easement obtained by the City. <br /> 8. After construction, including acceptable stands of seeded grass(at least 70%coverage per <br /> Minnesota NPDES General Stormwater Permit requirements),the City will maintain the <br /> South Oak Street bituminous roadway,the South Oak Street roadside ditches,the storm <br /> drainage infiltration basin,any storm drainage system improvements, and all grassed areas <br /> inside the permanent easement obtained by the City. <br /> From our previous meetings,we understood that this proposed agreement with enclosed figure <br /> needs to go through the Building and Grounds Committee and the School Board. <br /> We are hopeful that the adjustments we have made are acceptable to the School District. <br /> Please contact either myself or the City Clerk, Sandy Peine(218-568-5222) on next steps. <br /> WIDSETH SMITH NOLTING C17 4.„4, <br /> Timothy . Houle P.E. <br /> Encl. <br /> c: Sandy Peine, Pequot Lakes City Clerk,via Email only <br /> Mike Loven,Pequot Lakes Street Superintendent, via Email only <br /> WSN: Mike Rude and WSN File <br /> 1.. <br /> : 30B-City of Pequot Lake§0130B0037-South Oak St-W Lake to MilIek0130B0037.000.South Oak St <br /> Improvements1Correspondencd20080827--Mr Linnell at Schooldraft agreement for ROWItr.doc <br />