Laserfiche WebLink
Applicable Regulations: <br /> Section 17-5.8 SHORELINE RESIDENTIAL (SR) <br /> 1. Purpose and Intent: To provide a zoning classification for riparian <br /> residential development. The zone may or may not be served by municipal sewer <br /> and water, depending on availability. <br /> 2. Compatibility: The Shoreline Residential zone can only be established <br /> next to the Water Resource zone. The shoreline residential zone should be <br /> established to extend through the first tier of parcels on developed lake shore and <br /> to a public road or 500 feet from the OHW, whichever is closer to the water body <br /> on undeveloped shoreline. <br /> 3. Lot, Use and Density Requirements. <br /> GD Riparian Only RD <br /> 'Non-Riparian <br /> GD NE Lake <br /> Lot width at OHW and building line—feet, 100 150 200 <br /> minimum <br /> Lot width with guest quarters or duplex 180 225 300 <br /> Buildable lot area—square feet,minimum 20,000 40,000 80,000 <br /> Buildable lot area with guest quarters or duplex 40,000 80,000 160,000 <br /> —square feet,minimum <br /> Setback,right-of-way,local streets—feet, 10 10 10 <br /> minimum <br /> Setback,right-of-way,collector and arterial 30 30 30 <br /> streets—feet,minimum <br /> Setback,OHW—feet,minimum 75 100 200 <br /> Setback,bluff—feet,minimum 30 30 30 <br /> Setback,side—feet,minimum 10 10 15 <br /> Setback,corner side—feet,minimum 30 30 30 <br /> Setback,sign—feet,minimum 1 1 1 <br /> Setback,wetland—feet,minimum 30 30 30 <br /> Impervious coverage—maximum 20% 15% 10% <br /> Building height-feet,maximum 25 25 25 <br /> Building height,accessory structure not 13 13 13 <br /> containing guest quarter(s)-feet,maximum <br /> Flag Pole Height—feet,maximum 30 30 30 <br /> Building above highest known groundwater or 3 3 3 <br /> lake level—feet,minimum <br /> Maximum Density 1 unit/20,000 sq. ft. 1 unit/40,000 sq. ft. 1 unit/80,000 sq.ft. <br /> ISTS setback from OHW—feet,minimum 75 75 100 <br /> 4. Performance Standards. The following performance standards apply to all <br /> development in this zone: <br /> Pequot Lakes Staff Report 6.i-2 <br /> April 24,2023 <br />