My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08 - Water/Wastewater Monthly Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2008
>
06-03-2008 Council Meeting
>
08 - Water/Wastewater Monthly Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2014 10:01:18 AM
Creation date
9/22/2014 10:01:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Police A" City of Pequot City Hall <br /> 218-568-8111 <br /> Lakes 218-568-5222 <br /> Fax 218-568-5647 �,. Fax 218-568-5860 <br /> )lpd @pequotlakes-mn.gov 4638 County Road 11 cityhall @pequotlakes-mn.gov <br /> �.. � ; , ; Pequot Lakes, MN 56472 <br /> www.pequotlakes-mn.gov <br /> Mayor/City Council/City Clerk <br /> Pequot Lakes, MN <br /> Water/Wastewater Report <br /> May 2008 <br /> POTABLE DRINKING WATER <br /> I. Facilities Performance: <br /> Average daily gallons pumped: 127,346 gallons <br /> Maximum daily gallons pumped: 181 ,000 gallons <br /> Minimum daily gallons pumped: 69,000 gallons <br /> Total monthly gallons pumped: 3,311 ,000 gallons (as of the 26th) <br /> Average daily chlorine concentration: .26 mg/1 <br /> Required chlorine concentration: .2 to .5 mg/1 <br /> Average daily fluoride concentration: 1 . 1 mg/1 <br /> Required fluoride concentration: 0.9 mg/1 to 1.5 mg/1 <br /> Treatment Chemicals Used for the Month: 11 .8 gals Fluoride <br /> 22.6 lbs Chlorine <br /> II. Operations and Maintenance: <br /> • The MN Department of Health Monthly Fluoridation Report was completed and <br /> submitted. <br /> • All water main flushing was completed with the exception of Trailside Estates. No <br /> problems were encountered with any "brown water" issues. Three fire hydrants were <br /> very hard to open and close and will need to be further investigated, but are working <br /> properly. <br /> • Some map updating is being done with WSN. <br /> • Completed 2007 Consumer Confidence Report and sent newspaper notice to M.D.H. <br /> with report. <br /> • Have been identifying several curb boxes that need to be raised to ground level. <br /> • Completed or responded to 55 locates & 10 work orders <br /> WASTEWATER <br /> I. Facility Performance: <br /> a. CBOD Concentration <br /> Influent — mg/1 (Design — 250 mg/1) <br /> Effluent — mg/1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.