Laserfiche WebLink
� PEQUOT LAKES <br /> PLANNING AND ZONING COMMISSION <br /> MEETING MINUTES <br /> May 15, 2008, at 6:30 PM <br /> 1. Call to Order - 6:3o PM <br /> 2. Roll Call: <br /> Planning Commission: <br /> PRESSENT: Mary Peterson, Scott Pederson, Mark Hallan, ..Woog, Tom Adams, Dean <br /> Williams, and Bill Habein. ABSENT: John Derksen. <br /> City Council Liaison: Craig Nagel. <br /> City Planner: Charles Marohn, PE. <br /> 3. Public Hearings - None. <br /> 4. Additions or Deletions to Agenda - None <br /> 5. Open Forum - None <br /> • <br /> 6. New Business: <br /> a. Wilderness Point Resort Submittal Items <br /> Mr. Marohn reviewed the process and the fina plat, which is`ten <br /> l tatively scheduled for June. <br /> Dave Reese, WSN, presents grading plan discussion. He indicated that the number of units is <br /> decreasing, but the size s expanding from iox2o to 12x26. It falls into the same area and meets <br /> the buffer, but the number of units went down accordingly. This was desired by the owner to <br /> provide for better use of the units. <br /> Mr. Adams askea'ihQw many total ultimately. Mr. Reese indicates that there will be 68. The end <br /> units will be divided in two to be smaller units. Originally there were 8o proposed. <br /> Mr. .Reese discussed drainage. He stated that flow is generally from the southwest to the <br /> north/northeast. There will be some clearing for the access road, some of which does go into the <br /> buffer area. The vegetation plan shows the replanting of trees there to reforest the area. There <br /> will be a culvert through thereto maintain the drainage way. The runoff from the storage area <br /> will be containect within the storage area, which is large and exceeds the requirements for the <br /> storage area. The,a tual ,grading will remove material and the units will be set down, partially <br /> obscured by the eart�i. `The applicant is not opposed to planting additional vegetation, but the <br /> units will be lower than°the surrounding ground. <br /> Mr. Habein asked about stabilization on the back side of the units. Mr. Reese indicated that <br /> they are going to use a retaining wall. <br /> Discussion followed on drainage off of the building. Mr. Reese indicated that there will be a <br /> gravel liner on the edge of the building that will daylight at the north. <br /> Minutes 1 <br /> Pequot Lakes Planning Commission <br /> May i5, 2008 <br />