Laserfiche WebLink
Bullet 3 <br /> �.. The cost of 50% of the lift station and project sanitary sewer forcemain. The actual <br /> quantities installed were: <br /> 50% of the List Station=0.50 x $185,000= $92,500.00 <br /> 50%of PVC forcemain= 0.50 x 425 Lin Ft x $16/Lin Ft=$3,400.00 <br /> 50% of PE forcemain(dir. drilled) = 0.50 x 514 Lin Ft x$30/Lin Ft= $7,710 <br /> Actual Total=$103,610.00 <br /> Bullet 4 <br /> The cost difference between the previously proposed bituminous gutter and the required <br /> concrete curb and gutter. The difference is calculated by the actual lineal feet installed at a <br /> rate of$12.50 per lineal feet minus $10,750 in bituminous gutter cost. The actual quantity <br /> installed was: <br /> 3,355 Lin Ft x $12.50/Lin Ft= $41,937.50 - $10,750.00=$31,187.50 <br /> Actual Total=$31,187.50 <br /> The total cost associated with these items totals $163,303.25. For your use I have enclosed a <br /> copy of this portion of the Developer's Agreement as well as a summary of items installed at <br /> the most current payment voucher which includes quantities installed as of July 25, 2007. <br /> The items listed in these four bullets were installed but not accepted by the City of Pequot <br /> Lakes at that time. <br /> If you have any questions or concerns regarding this please feel free to contact me or Will <br /> Hoyt at 568-4940. <br /> Sincerely, <br /> Landecker& Associates,Inc. <br /> Bryan G. Drown, PE <br /> Cc: 061350 <br /> City of Pequot Lakes <br />