My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.03 - Trailside Estates
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2008
>
03-03-2008 Council Meeting
>
10.03 - Trailside Estates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2014 3:36:01 PM
Creation date
9/18/2014 3:26:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Landecker Associates, InC. 4646 County Rd. 11 •P.O.Box 120•Pequot Lakes,MN 56472 <br /> Engineering• Surveying• Planning 218-568-4940• 888-866-4940•Fax:218-568-5404 <br /> www.landecker.com <br /> February 15, 2008 <br /> Carl Smith <br /> Car-Col Construction <br /> 19513 State Highway No. 371 <br /> Brainerd,MN 56401 <br /> RE: Trailside Estates—Cost summary of items to be applied to future water and <br /> sewer access charges. <br /> Dear Corky, <br /> At your request we have tabulated the costs of the items listed in Section XXVLH of the <br /> Trailside Estates Developer's Agreement based on quantities actually installed at the <br /> development. Based on estimated quantities at the time the Developer's Agreement was <br /> drafted it was estimated that$164,563.00 would be waived in the form of water and sewer <br /> access charges. The cost of these items based on actual installed quantities is as follows: <br /> Bullet 1 <br /> This item is the cost difference to upsize the watermain along County Road#112 from 6"to <br /> 10". There are two different watermain materials as a portion was directionally drilled and a <br /> portion installed with an open trench method. The cost difference for the directional drilled <br /> watermain was determined to be $28 per lineal foot and the cost for the open trench <br /> watermain was $8 per lineal foot. The actual quantities installed were: <br /> Open trench method=6 Lin Ft x $8/Lin Ft=$48.00 <br /> Directional drilled method=650 Lin Ft x $28/Lin Ft=$18,200.00 <br /> Actual Total=$18,248.00 <br /> Bullet 2 <br /> The cost of gravity sewer installed from Trailside Loop to County Road#112. The actual <br /> quantities installed were: <br /> 1 Manhole=$2,000.00 <br /> 9.67 Extra manhole depth=9.67 Ver Ft x $125/Ver Ft= 1,208.75 <br /> 263 Lin Ft 8"PVC sewermain(18'-20' depth)=263 Lin Ft x $23/Lin Ft= 6,049.00 <br /> Traffic Control= $1,000.00 <br /> Actual Total=$10,257.75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.