My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.1 Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2022
>
07-05-2022 City Council Meeting
>
9.1 Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2022 12:03:50 PM
Creation date
7/1/2022 12:03:49 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of <br /> Pequot <br /> Lakes <br /> Water/Wastewater Report — June 2022 <br /> 9) The damaged fire hydrant at the intersection of East Grove and Rasmussen Road was <br /> replaced on June 6th. Borden Excavating did a nice job as usual. <br /> 10)Wastewater pond dikes were sprayed with herbicide for weed control. <br /> 11)The City Hall onsite sewer lift station was repaired in early June. I replaced a few floats <br /> and installed new stainless racks. Bengston Electric will be back to clean up the <br /> electrical in the next couple weeks or so. <br /> 12)Some root sawing and sewer cleaning was done on West Grove, Pine and Spruce Streets <br /> in mid-June. <br /> 13)I did a little surveying of the condition of the City's storm sewer catch basins around <br /> town and found a few needing some work. Repairs have been made on Main,West <br /> Grove, Sibley, and Woodman Streets. <br /> Respectfully Submitted by Andy Schwartz,Water/Wastewater Operations Manager, City of <br /> Pequot Lakes. Please feel free to call my cell at 320-232-5787 with any questions/concerns. <br />
The URL can be used to link to this page
Your browser does not support the video tag.