Laserfiche WebLink
City of <br /> Pc uot <br /> Lakes= <br /> Water/Wastewater Report — June 2022 <br /> Water Dept. <br /> Facility Performance for May 2022: <br /> Flow <br /> Average daily gallons pumped: 180,000 gallons <br /> Maximum daily gallons pumped: 234,000 gallons <br /> Minimum daily gallons pumped: 143,000 gallons <br /> Total monthly gallons pumped: 5,399,000 gallons <br /> Lab <br /> Average daily chlorine concentration: 0.37 (mg/1) <br /> *Recommended chlorine concentration: 0.2 to 0S mg/I <br /> Average daily fluoride concentration: 0.62 (mg/1) <br /> *Recommended fluoride concentration: 0.5 mg/I to 0.9 mg/I <br /> Wastewater Dept. <br /> Facility Performance for May 2022: <br /> Flow <br /> Average Daily Flow: 68,820 gallons (Design—121,795 gal/day) <br /> Maximum Daily Flow: 83,744 gallons <br /> Minimum Daily Flow: 57,515 gallons <br /> Total Monthly Flow: 2,133,420 gallons <br /> Operations Report <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday,Wednesday, and <br /> Friday. <br /> 3) Monthly lift station maintenance(check amps, clean floats,inspect wet well, etc)was <br /> completed on 6/13. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 6/23. <br /> 6) Monthly fluoride report was submitted to Minnesota Department of Health on 6/1. <br /> 7) Monthly Discharge Monitoring Report for the WWTP was submitted to MPCA on 6/2. <br /> 8) Quarterly Discharge Monitoring Report for the WTP was submitted to MPCA on 6/9. <br />