My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.4 Coleman Drive Draft Feasibility Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2022
>
03-01-2022 City Council Meeting
>
9.4 Coleman Drive Draft Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2022 2:22:54 PM
Creation date
2/25/2022 2:22:50 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
In general,improvements to Coleman Drive would be similar to Alternative 1. <br /> The proposed improvements are shown in more detail in Exhibit 3 in Appendix A.The existing <br /> and proposed typical sections can be found in Appendix B. <br /> After further consideration of these 2 alternatives, it was decided not to further consider <br /> Alternative 2. There would basically be the same general level of impact and improvements to <br /> Coleman Drive,and the additional impact due to lowering Pequot Boulevard was deemed not <br /> beneficial. <br /> CITY OF PEQUOT LAKES Page 9 FEASIBILITY REPORT <br /> WIDSETH PROJECT NO.2021-12098 COLEMAN DRIVE <br />
The URL can be used to link to this page
Your browser does not support the video tag.