My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.2 Joint Road Project Request for Proposal (RFP)
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
11-10-2020 City Council Meeting
>
09.2 Joint Road Project Request for Proposal (RFP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2021 4:10:59 PM
Creation date
3/8/2021 3:39:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 16 of 19 <br /> <br />will be to ensure that construction operations are being performed in accordance <br />with the project specification, plan, and contract. In addition, the inspector shall <br />confirm that all federal, state, and local regulations are being followed throughout <br />the construction phase. Furthermore, the inspector shall verify and record all <br />quantities using an item document ledger to ensure contractor pay requests are <br />accurate. It is the duty of the inspector to keep a daily journal documenting the <br />construction process. <br /> <br />2.3.4. Project Completion <br /> Upon completion of the construction phase, the Consultant shall certify that the <br />project meets the following requirements: <br />x 95% substantial completion <br />x The project meets all federal, state, and local regulations <br />x All construction documentation has been completed <br />x All environmental documentation is finalized <br />x All funding documentation is complete <br />x Final contractor payments have been made <br />x As-built plans have been delivered to all road authorities <br /> <br /> <br />3. SCHEDULE <br />The schedule for the services described in this document will be formalized during the <br />development of the project contract. The final schedule must include October 1, 2021 as the <br />hard deadline for all Phase 1 deliverables to be complete. The consultant shall include <br />intermediate deadlines in the proposal for all project deliverables defined in Section 2 of this <br />document. <br /> <br />Response to Proposals Due December 1, 2020 <br />Potential Consultant Interview December 8, 2020 <br />Consultant Selection Made December 15, 2020 <br />Notice to Proceed January 1, 2021 <br />Phase 1 Deliverables Complete October 1, 2021 <br />Phase 2 Deliverables Complete TBD <br />Phase 3 Deliverables Complete TBD <br />Contract Complete TBD <br /> <br />4. COMPENSATION FOR SERVICES <br />It is the intention of the City/Township Coalition to enter into a professional service contract <br />for the scope of work provided in Phase 1 of Section 2 (Scope of Services and Deliverables) <br />of this document. Dependent upon the results of Phase 1 and the feasibility of moving the <br />project forward, a future contract may be issued for Phase 2 and Phase 3. The contract will be <br />based on a fee and itemized task schedule, developed by the respondent, with maximum not-
The URL can be used to link to this page
Your browser does not support the video tag.